EASTMAN B-150 RENOVATIONS
Auditorium
Auditorium

Eastman B-150 Renovations
Kingsport, Tennessee

Auditorium

Work included renovations to the existing Auditorium to upgrade all finishes, new seating and audio/visual systems. A new breakout/collaboration space was also created.

 

NMR Lab

The NMR Lab was a design-build project in 2012. This lab consisted of renovating the floors, new walls, ceilings, installing new lab hoods and casework, along with adding services to a new NMR machine and aluminum ladders to access the machine. The lab also has new windows added to the corridor for viewing access.

 

B-174D Pilot Plant

The building consisted of a work/viewing room, a firehouse attached to the structure, hood process room, and electrical room. The building was designed to allow for a future mezzanine to be installed.

Careful coordination between Eastman engineers and CRW engineers from the site was required to plan the structural, plumbing, and HVAC design. This was a fast track project that GRC delivered on time and in budget.